Actual title for this project is "Relocate Tower, Site Prep, Ship In A Box" given by Lackland Air Force Base. Project is a Design-Build project and consists of designing the entire project, the construction of a new Guard Tower, a Mock Brig, preparing a site for a Mock Ship, and providing primary and secondary electrical to all three sites. Concrete foundations for all three structures was designed and constructed. Project also consisted of the designing and construction of a new roadway, new fence line and new gates.